Skip to content Skip to navigation

The long-awaited Taipa Ferry Terminal

Thu, 18th May 2017

Taipa’s new maritime terminal, which has been under construction since 2005 was inaugurated on the 18th May 2017. It cost MOP 3.8 billion (US$475 million).

With an annual capacity of 30 million passengers, the terminal has an area of 200,000 square metres (20 hectares) with 16 ferry berths, 3 berths for multi-purpose use, a heliport with capacity for 5 helicopters, 88 immigration desks and a car park for 740 vehicles.